Huntingdon Station
Location:
• 2047 Sumas Way, Abbotsford, BC
Program:
• Two phase project
• Phase One included a renovation of an existing building
• Phase Two designed with a 200 seat restaurant building and a 4000 s.f. bank building
• Total floor area (all phases): 18,430 s.f.
Systems:
• Wood frame construction
• Exterior finish: brick veneer, stucco, exposed steel
Status:
• Phase One construction completed 2004; Phase Two design completed 2005